Underground Conveying Project in Canada

Underground Conveying Project in Canada

Underground Conveying Project in Canada
Underground Conveyors

Location

Canada

Year

2020

Material

Gold

Application

Underground Conveying

Underground Conveying Project for gold mine in Canada

TNT successfully delivered an underground conveying system for a gold mine in Canada involved the design, supply, and installation of underground conveyors, transfer tower system and electrical substation – all delivered with a compressed schedule and zero Lost Time Incidents (LTIs). The system was designed to handle challenging conditions including cold weather (-25°C) and remote site location.

SCOPE OF WORKS

  • Design Supply, Install (CCI)
  • Underground Conveyors, Transfer Tower System
  • Electrical Substation and Modular E-Room

DESIGN BASIS

  • Site Elevation: 300m
  • Material: Gold Ore
  • Capacity (design): 600mtph
  • Lump Size: 200mm
  • Temperature: 0°C min — 25°C max
  • Connected Power: 1342kw
  • System Operation: 1166kw

HIGHLIGHTS

  • Compressed schedule
  • Zero Lost Time Incidents (LTIS)
  • Cold weather
  • Remote site location