Tailings Stacking project in Saudi Arabia
This tailings stacking project in Saudi Arabia involved the design and supply of a plant and overland conveyors, as well as dual mobile stacking systems and electrical distribution and E-rooms. Notably, this project was one of the world’s first successful dry stack tailings systems, featuring fully redundant dual stacking systems with 99% availability, and has been in continuous operation since 2011. The system was designed to handle the challenging conditions of the site, including a temperature range of 0°C – 50°C.
SCOPE OF WORKS
- Design and Supply
- Plant and Overland conveyors
- Dual Mobile Stacking Systems
- Electrical Distribution and E-rooms
DESIGN BASIS
- Site Elevation: 350m
- Material: Phospho-Gypsum
- Capacity (design): 1,430mtph
- Lump Size: 13 mm
- Temperature: 0°C min — 50°C max
- Connected Power: 2,239kw
- System Operation: 1,823kw
HIGHLIGHTS
- One of the world’s first successful dry stack tailings systems
- Fully redundant dual stacking systems with 99% availability
- Continuous operation since 2011