Tailings Stacking Project in Saudi Arabia

Tailings Stacking Project in Saudi Arabia

Tailings Stacking Project in Saudi Arabia
Mobile Stacking SystemsTailings Stacking

Location

Saudi Arabia

Year

2011

Material

Gypsum

Application

Tailings Stacking System

Tailings Stacking project in Saudi Arabia

This tailings stacking project in Saudi Arabia involved the design and supply of a plant and overland conveyors, as well as dual mobile stacking systems and electrical distribution and E-rooms. Notably, this project was one of the world’s first successful dry stack tailings systems, featuring fully redundant dual stacking systems with 99% availability, and has been in continuous operation since 2011. The system was designed to handle the challenging conditions of the site, including a temperature range of 0°C – 50°C.

SCOPE OF WORKS

  • Design and Supply
  • Plant and Overland conveyors
  • Dual Mobile Stacking Systems
  • Electrical Distribution and E-rooms

DESIGN BASIS

  • Site Elevation: 350m
  • Material: Phospho-Gypsum
  • Capacity (design): 1,430mtph
  • Lump Size: 13 mm
  • Temperature: 0°C min — 50°C max
  • Connected Power: 2,239kw
  • System Operation: 1,823kw

HIGHLIGHTS

  • One of the world’s first successful dry stack tailings systems
  • Fully redundant dual stacking systems with 99% availability
  • Continuous operation since 2011