Greenfield Overland Conveyors for iron ore mine in Australia
This greenfield overland conveyor project for an iron ore mine in Australia involved the Engineering, Procurement, and Construction (EPC) of a high-capacity system consisting of seven overland conveyors. Notably, the project was completed with zero Lost Time Incidents (LTIs) and demonstrated the advantages of early contractor involvement, modularization and offsite assembly. This approach not only ensured safety but also optimized efficiency and minimized downtime during construction and installation.
SCOPE OF WORKS
- Engineering, Procurement and Construction (EPC) of the following:
- Overland Conveying System
- Seven Overland Conveyors
- Modularized Transfer Towers
- Electrical Substations, Modular E-Rooms and Automation
DESIGN BASIS
- Site Elevation: 600m
- Material: Iron Ore
- Capacity (design): 4,500 to 7,400mtph
- Lump Size: 152mm
- Temperature: -3°C min—50°C max
- Total Connected Power: 14,560 kW
- System Operating Power: 6,550 kW
HIGHLIGHTS
- Zero Lost Time Incidents (LTIs)
- Early Contractor Involvement (ECI)
- Modularization and Offsite Assembly
- Heavy lift multi-modal transport