Heap Leach Stacking and Agglomeration Project for gold mine in Burkina Faso
A major gold operation in Burkina Faso required a heap leach stacking system that could handle operating in challenging conditions, including temperatures of up to 50°C. TNT designed and supplied an innovative solution, which required expansion two years after its original commissioning. The result was a highly efficient system capable of processing 7.5 million tonnes of ore per year and designed for 4-6 stacking lifts.
SCOPE OF WORKS
- Design Supply, Technical Advisory Services
- Agglomeration Drum, Overland Tripper Conveyor with Mobile Tripper feeding a Mobile Grasshopper Conveyor System with Telescoping Radial Stacker
- Electrical, transformers, distribution ERooms
- Overland Expansion, 2018
DESIGN BASIS
- Site Elevation: 335m
- Material: Gold
- Capacity (design): 1707mtph
- Lump Size: 32mm
- Temperature: 16°C min — 50°C max
- Connected Power: 2215kw
- System Operation: 1694kw
HIGHLIGHTS
- Extreme 50°C operating temperature
- 7.5 mtpa of ore
- 14 m long agglomeration drum
- Designed for 4-6 stacking lifts