Conveying, Heap Leach, Waste Stacking Project at Russian gold mine
The harsh and remote conditions of a Russian gold mine posed a unique challenge for TNT, who were tasked with designing and supplying a complete conveying, heap leach and waste stacking project. The project was specifically designed to operate in extreme Arctic temperatures of up to -55°C, with a capacity of 2,000mtph. To ensure a seamless and efficient operation, TNT opted for a solution that included the use of modular electrical substations and E-rooms, while modularization and offsite pre-assembly enabled a faster and more cost-effective construction methodology.
SCOPE OF WORKS
- Design Supply
- Overland Stacking and Reclaim Conveyor System
- By-Pass Fixed Stacker, Reclaim System
- On-Off Heap Leach Mobile Stacking Reclaim System
- Waste Ore Mobile Stacking System
- Electrical Substations and Modular E-Rooms
DESIGN BASIS
- Site Elevation: 1,400m
- Material: Gold Ore, Waste
- Capacity (design): 2,000mtph
- Lump Size: 200mm
- Temperature: -55°C min — 35°C max
- Connected Power: 6,576 kw (winter)
- System Operation: 4,233 kw (winter)
HIGHLIGHTS
- Designed for –55°C “arctic duty” operation
- Remote mine location
- Modularization and offsite pre-assembly