Skip to Content

Bouly

Sort by Country Sort by Commodity Sort by Conveyor Sort by Application

In 2016 the Bissa gold mine in Burkina Faso was expanded with the launch of a heap leach operation at the nearby Bouly deposit. TNT designed and supplied an 18’-8" x 50’ agglomeration drum, 48” x 2,630’ long overland conveyor, mobile tripper with 54” x 35’ cross conveyor, and 48” mobile stacking system. This was the second agglomeration drum supplied by TNT.

The mobile stacking equipment for the new 1,700 mt/h operation comprises 23 portable conveyors: a series of twenty 125’ “grasshopper” style portable conveyors, a 98’ Horizontal Feed Conveyor, 140’ Horizontal Conveyor, and a 120’ Radial Stacker with 20’ telescoping stinger.

This system added to TNT’s project experience in the region, which includes the world’s first commercial-scale uranium heap leach stacking system in neighboring Niger.