For the construction of the new Kisladag gold mine in 2005-06, TNT designed and supplied two 42" overland conveyors totaling 8000' and one fixed stacker, as well as the complete 42" mobile stacking system and mechanical components for 13 in-plant belt conveyors.

In 2010-11, these two overland conveyors and the mobile stacking system were upgraded from 1,600 t/h to 2,400 t/h, and TNT designed and supplied three new in-plant conveyors at the crushing plant. TNT then supported the Phase II expansion of the stacking area by upgrading 16 existing mobile conveyors and designing and supplying a new 1,970' overland conveyor, tripper with cross conveyor, eight new 42" x 125' portable conveyors, 54" x 140' Horizontal Conveyor and 42" x 120' Radial Stacker with 20' telescoping stinger.

TNT supported the Phase III pad expansion in 2015 by designing and supplying a mobile tripper with 54" x 38' cross conveyor and onboard hydraulically positioned diverter chute.